Bottleneck Calculator Between Two Steps

When a delivery goes through two stages, increasing the faster one may not increase the total delivered. Compare the capacities of the two stations and see which limits the flow, in addition to the hours needed to meet all demand.

Free, no sign-up required

Do it with your values

Working hours exclusive to stage A in the period, after removing stops and preparation.

Minutes of processing a unit in step A.

Working hours exclusive to stage B in the same period as A.

Minutes per unit in stage B. Use the same definition of a unit.

Units that need to go through both stages in the period.

The calculation stays in your browser. Nothing is sent.

In action

See an example

Stage A has 20 hours and takes 15 minutes per unit: it processes 80 in the period. Stage B has 16 hours and takes 20 minutes: it processes 48. B is the bottleneck. To deliver the 60 units ordered, B would need 20 hours, 4 more than it has.

Use “Fill in example” to try these fictional values.

How we calculate

  1. Capacidade de cada etapa = horas disponíveis × 60 ÷ minutos por unidade, arredondada para baixo.
  2. A menor capacidade limita a vazão quando as duas etapas trabalham em ritmo constante.
  3. Comparamos a demanda com esse limite. Em cada etapa, horas adicionais = demanda × minutos ÷ 60 − horas disponíveis, nunca abaixo de zero.

Two stages, two resources

The two stages need different resources.

The model assumes two stages working at the same time on different units: while one prepares the next, the other finishes the previous one. Each stage's hours belong to the same period.

If the same person does both tasks, one after the other, the calculation is different: add the times and compare with that person's hours.

Remove setups and stops from the available hours before filling in.

Where the bottleneck is

Improving one stage may just move the queue.

The overall volume follows the slowest stage. If you add hours to it, the other one may become the new bottleneck. That is why the table shows the extra hours for both to meet all the demand.

The calculation compares throughput at a steady pace. It does not estimate:

  • the time to start a batch with empty stages
  • waiting and transport between stages
  • how queues are organized

Questions when filling out

What happens if the two capacities are the same?

Both stages limit the volume at the same time. Increasing only one leaves idle capacity in it, and the volume stays limited by the other.

Are additional hours enough to promise a deadline?

No. They show the difference in load at each stage for the chosen demand. Sequence, batch start, intervals and simultaneous availability still need to enter into delivery planning.

Sources and further reading

Meet Focca and how we treat your data.

Organize everyday life with Focca

Write down the restriction found and the costs of the change considered. See how to use notes and financial records in Focca.