Skip to main content
Find your way

Getting organized can start with a simple hi.

Message me on WhatsAppA free trial, no card needed.

Stock and purchases · free tool

Order Point and Coverage Calculator

Waiting for stock to run out before purchasing can interrupt deliveries. Use daily consumption, supplier deadline and chosen security to define a replenishment point, also considering confirmed purchases and reserved units.

Free, no sign-up required

Do it with your values

Average units used or sold per day. Must be greater than zero.

Days from order to availability for use, from 0 to 365.

Security quantity defined by you, without automatic statistical prediction.

Only usable physical units, before discounting reserves.

Units from confirmed purchases. Check separately when they arrive.

Units committed to orders already accepted.

The calculation stays in your browser. Nothing is sent.

In action

See an example

You sell 8 units a day, the supplier takes 5 days and you want 12 as safety stock. The reorder point is 8 × 5 + 12 = 52 units. Today there are 34 on the shelf, 10 on the way and 4 reserved: the position is 40, 12 below the point. The 30 free units on the shelf last 3.75 days.

Use “Fill in example” to try these fictional values.

How we calculate

  1. Ponto de pedido = consumo diário × prazo de entrega + segurança, arredondado para cima em unidades inteiras.
  2. Posição de estoque = físico + compras confirmadas − reservas. A reposição é acionada quando a posição atinge ou fica abaixo do ponto.
  3. Cobertura física livre = (físico − reservas) ÷ consumo diário, nunca abaixo de zero. Mercadoria a caminho não entra nessa conta.

Physical, on the way and reserved

Stock position is not the same as the shelf.

  • Physical stock: what already exists and can be used.
  • Purchases on the way: still depend on delivery, but prevent a duplicate order when arrival is confirmed.
  • Reservations: units promised to orders, which cannot be used for new sales.

The result shows this position and also the days of free physical stock. That way, promised goods do not look ready to ship.

Lead time and safety stock

The lead time starts when you are able to place the order.

Count the whole interval between ordering and having the unit ready to use: processing, transport and checking.

Safety stock is a quantity you choose. The site does not calculate a statistical level.

If the supplier is late or consumption changes, review both assumptions. The distance below the point shows urgency, but it is not the quantity worth buying for the next cycle.

Questions when filling out

Do I include a purchase without a confirmed date?

Avoid treating an uncertain order as guaranteed stock. Simulate without that purchase and see the effect on the position. Keep the arrival date in a separate record.

What does it mean to hit the spot exactly?

It is the replacement trigger for this model. The planned available stock is equivalent to consumption during delivery plus the chosen security, so it is time to review or activate the purchase.

Sources and further reading

Meet Focca and how we treat your data.

Organize everyday life with Focca

Replenishment also creates payment commitments. Discover Focca's reminders and expense record to track these purchases.

Try it on WhatsApp

Conheça o controle financeiro pelo WhatsApp and the secretária virtual no WhatsApp.

See how it works or explore the plans.