Skip to main content
Find your way

Getting organized can start with a simple hi.

Message me on WhatsAppA free trial, no card needed.

Price and margin · free tool

Minimum Order Quantity Calculator

Preparing a small order can cost almost the same as preparing a larger one. Calculate how many units are needed to pay for the exclusive preparation of the order and still leave the chosen surplus in reais.

Free, no sign-up required

Do it with your values

Exclusive expense that occurs once to prepare this order.

Price charged for each unit of the order.

Material and other expenses that are repeated per unit.

Percentages discounted from the total sale, according to your contract.

Remains in reais desired after paying for preparation and variables.

The calculation stays in your browser. Nothing is sent.

In action

See an example

Each unit sells for R$30. After R$3 in fees (10%) and R$18 in variable cost, each one leaves R$9. Setup costs R$120 and you want R$60 left over, so R$180 must be covered. That takes at least 20 units, in an order of R$600.

Use “Fill in example” to try these fictional values.

How we calculate

  1. Contribuição por unidade = preço × (1 − taxas/100) − custo variável. Ela precisa ser positiva.
  2. Quantidade mínima = (preparação + sobra desejada)/contribuição, arredondada para cima até uma unidade inteira.
  3. Multiplicamos quantidade por preço para obter o valor do pedido e descontamos a preparação da contribuição total para conferir a sobra.

What counts as setup

Separate the setup that happens only once.

Assembly, configuration, a mold or organizing the order can happen before the first unit. Only that expense goes into setup.

Material repeated in each piece goes into the variable cost per unit.

If the setup can be reused for future orders, decide how much of it belongs to this order and keep that rule. The tool does not split this cost among customers.

When the order is small

The minimum quantity is something to negotiate.

The calculation may show that a smaller order does not pay for the setup under the advertised terms. That opens options:

  • charge for setup separately
  • change the scope
  • combine deliveries
  • review the unit price

The result does not force the customer to buy that quantity. It also does not prove that the volume fits your schedule or that the month's fixed costs are already paid.

Questions when filling out

What is the difference to the monthly breakeven point?

Here the fixed expense happens once in this order. The monthly break-even point brings together the business structure and verifies the volume needed throughout the month.

What if I don't want additional leftovers on this order?

Enter zero in the desired remainder. The resulting amount covers the preparation and variables filled in, but does not reserve extra value for other expenses that were left out of the account.

Sources and further reading

Meet Focca and how we treat your data.

Organize everyday life with Focca

When you close the order, track input, materials and subsequent receipts. Learn about financial control for working at Focca.

Try it on WhatsApp

See how it works or explore the plans.