Time calculator in three scenarios
A task can take more or less time depending on the conditions. Compare optimistic, usual, and pessimistic durations to set aside time in your calendar.
Free, no sign-up required
In action
See an example
A task may take 2 hours in the optimistic scenario, 4 in the usual one and 9 in the pessimistic one. The simple average is 5 hours and the gap between the extremes is 7. With 6 hours available, 4 or 2 hours are left, or 3 are missing, depending on the scenario. The slack compared with the average is 1 hour.
Use “Fill in example” to try these fictional values.
How we calculate
- Conferimos a ordem das hipóteses: duração otimista menor ou igual à usual, e usual menor ou igual à pessimista.
- Somamos as três durações e dividimos por três, usando uma média simples dos cenários informados.
- Calculamos a amplitude entre extremos e a diferença de cada cenário para o tempo disponível. Valores negativos mostram falta de espaço na agenda.
Where each scenario comes from
Give each number a reason. The optimistic scenario may depend on materials being ready. The pessimistic one, on an extra review or on information that is still missing.
Three guesses chosen only to reach a desired average do not improve planning.
The usual scenario should be what you find plausible, not necessarily the exact middle between the extremes.
Average and probability
The average of the scenarios does not measure the chance of it happening. The three numbers are not observations from a known distribution. That is why the math does not say what the chance is of finishing in 5 hours or treat the extremes as a confidence interval.
Use the comparison to decide how much room to keep and which risks you can reduce. If you have a history of similar tasks, compare the estimates with what actually happened.
Questions when filling out
Does this use the weighted PERT formula?
No. This page uses the simple average of the three durations, according to the estimation reference cited. Does not apply 1:4:1 weights and does not calculate standard deviation or probability.
Can I provide three equal durations?
Yes. The average will be the same value and the amplitude will be zero. This expresses your hypotheses, but does not prove that the task is not uncertain or may be interrupted.
Sources and further reading
- NASA — Schedule Management Handbook, 2010 (opens in new tab)
Task dependencies, time estimates, and reviewing plans.
Organize everyday life with Focca
Record what made each scenario change and compare it to the actual time after completion. This history helps to improve upcoming calendar appointments.