Personal project stage planner

Some stages can happen together. Others only start when everything before them is done. Set up 2 independent branches and a shared final stage to see the minimum deadline, the wait of the shorter branch and the slack against the time available.

Free, no sign-up required

Do it with your values

Step that can occur at the same time as branch B.

Only consider parallel if there are independent resources.

It starts only when the previous two branches have finished.

Time between the start and the chosen limit. Do not enter a date.

The calculation stays in your browser. Nothing is sent.

In action

See an example

Branch A takes 4 days and branch B, 7. If both can truly run in parallel, the 2-day final stage starts after day 7 and ends after day 9. In sequence, it would take 13 days. With 10 days available, 1 day is left, and branch A waits 3 days for B to finish.

Use “Fill in example” to try these fictional values.

How we calculate

  1. Consideramos que os ramos A e B começam juntos, com recursos independentes.
  2. O início da etapa final fica no término do ramo mais longo. Somamos sua duração para obter o prazo mínimo do conjunto.
  3. Comparamos esse prazo com o tempo disponível e com a execução inteiramente em série. A diferença entre os ramos é a espera do mais curto.

When parallel work holds

Parallel work has to be possible in real life. If the same person must work fully on both stages, putting the branches side by side does not create time.

Parallel makes sense when one stage is with someone else or depends on a wait that frees you for something else. Confirm that independence before using the shorter deadline.

If it does not exist, the sequential duration is the more faithful reference.

Waiting and effort

Waiting is not the same as effort. A branch can take a few hours of work and several calendar days because it depends on an outside reply.

Use the same kind of duration in all three fields: the time between start and finish. Do not mix hours of effort converted into days with days of waiting.

The tool shows the dependency, but it does not predict third-party delays or let the final stage start with something pending.

Questions when filling out

Which branch determines the deadline?

The longest determines when the final step can begin. Reducing a branch that already ends before the other does not shorten the set.

Can I include a margin day?

Yes. Compare the minimum term with an available term that contains this margin. The gap is made explicit. Don't secretly increase all durations and then interpret the result as minimum time.

Sources and further reading

Meet Focca and how we treat your data.

Organize everyday life with Focca

Organize milestones for each step and confirm dependencies before marking completion. Reminders can help track returns and intermediate deliveries.

Try it on WhatsApp

See how it works or explore the plans.